Skip to content
Back to the worked example

HARBOR · Harvest findings memo

Three candidates, one scorecard, and a recommendation not to build

Composite
Prepared for
Composite firm
Basis
8 quarters of delivery record
Instrument
Service-to-Product Fit, 6 dimensions
Decision
Investigate

1. What this memo is

This is the findings memo a Harvest Sprint delivers, applied to a composite firm so that every number can be shown. It is not a client. The firm is 58 people with $14M of revenue concentrated in two primes, holding one GSA MAS schedule and one agency IDIQ, and its delivery record contains a reusable assessment package that has run at several program offices with roughly 90 percent of the same evidence set.

The question: can that package be sold as a product? The memo answers with the instrument, the threshold checks, and the two conditions that have to be true before any build money is spent.

2. Candidates considered

The firm brought three. Two were eliminated before scoring, and the reasons matter because each is a common false positive.

CandidateVerdictWhy
Program support for one sponsorEliminatedOne sponsor, one program, no second buyer. A one-off program is not a product, however profitable it was.
Staff augmentation lineEliminatedThe unit sold is hours. There is no deliverable to package, so nothing separates from the labor.
Authorization assessment packageScoredRepeatable, transferable, and priced by the deliverable. It goes to the instrument.

3. The scorecard

Six weighted dimensions, scored 1 to 5. The weighted total is the sum of each score times its weight.

DimensionWeightScoreContrib.Reason
Repeatability20%51.00The same package runs at every program office. Roughly 90% of the work is the same evidence set, the same review pass and the same document structure. Two people deliver three of these a quarter without redesigning anything.
Cross-Agency Demand15%20.30Two agencies have bought the work, and both came through the same prime. There is no independent third agency with a budget line, and no route to one that does not run through that relationship.
Compliance Leverage15%50.75The package exists because an authorizing official needs evidence. Compliance is the product, not a cost on top of it. The deliverable is a package the official can accept.
Vehicle Access20%51.00Both vehicles accept a product CLIN at this scope, and both have carried work of this size. Two program offices inside the existing agencies have asked for a fixed-price version, so the first buyers are named rather than hoped for.
ATO Feasibility15%20.30An authority to operate is required if the package becomes a hosted service. No sponsor has committed. The path is understood and unfunded, and the cost is material against this product's projected margin.
Economic Viability15%50.75Break-even is four program offices, and four exist across the two agencies already buying. Three-year revenue clears five times the investment at a realistic win rate. The model does not require winning a third agency.
Weighted total100%4.10Clears the 4.0 threshold and still does not proceed.

4. The five checks

A total is not a decision. All five checks pass for a Proceed. One failure downgrades the result.

  • Weighted total is at least 3.0 — Total is 4.10
  • No dimension scored 1 — Lowest score is 2
  • At most one dimension scored 2 — 2 dimensions scored 2
  • Vehicle Access is at least 2 — Scored 5
  • Economic Viability is at least 2 — Scored 5

2 dimensions scored 2, which fails the third check. Two scores are also vetoes: a 1 on Vehicle Access or Economic Viability eliminates a candidate whatever the total says. This one scores 5 on both, so the veto does not fire.

5. Recommendation

Do not go to Build. Go to Architect, and only after two things are true:

  1. a named sponsor for the authority to operate, with a budget line;
  2. a third agency with its own budget line, not one reached through the existing prime.

Do not package the other two candidates. One is a program with a single sponsor; the other is staff augmentation. Both are fine work and neither is a product, and packaging either spends the firm’s credibility on something a contracting officer will see through.

One more thing to hold: the product would displace some of the service. The same buyers would buy it at a lower price. That is acceptable only if the product reaches program offices the service never reaches. If it does not, keep selling the service and stop here.

6. What this costs if it is wrong

Building first is the expensive mistake. A build plus a certification program before a named buyer commits is how a $50,000 idea becomes a $700,000 program, and the certification is the line that does not come back. The order is: validate, sell a founding version, build, then authorize.

Composite sample, prepared to show the instrument rather than a client result. No client numbers appear here. Every score is recomputable at harborgovcon.com/proof.

HARBOR Initiative LLC · A real Harvest memo runs 10 to 15 pages and covers the delivery record in detail.